Tiling onto Concrete surface ?
For at least 28 days, concrete surfaces should be dry. hydrostatic, ancient, and devoid of standing water pressure and a plenty of moisture. The concrete’s quality must provide a direct tensile bond of at least 1.2 mPA. Concrete slabs must be laid above and below grade over an adequate and efficient vapor barrier in accordance with …